How much do solar panels cost?

A 4kW system costs £5,500 to £9,500 fitted and a 6kW system £7,500 to £12,000. Scaffolding is £600 to £1,200 of that figure and is the line most often missing from a cheap quote.

A tiled roof with a solar array on its rails, scaffold to one side and the inverter on the wall below

Typical prices

Ranges, not quotes. A quote depends on your room.

WorkTypical UK price
4kW array, tiled pitched roof£5,500 to £9,500
6kW array, tiled pitched roof£7,500 to £12,000
Flat roof ballasted frame, 4kW£6,500 to £10,500
Scaffolding, two storey house£600 to £1,200
Bird proofing to the array perimeter£300 to £700
Solar diverter to an immersion heater£350 to £600

Zero rated VAT runs to 31 March 2027 and then returns to 5%. On a £8,000 installation that is £400, which is larger than most seasonal offers and it does not need negotiating for.

What moves the price

  • Roof access. Scaffolding on a three storey house or a restricted frontage costs more than on a bungalow.
  • Roof covering. Slate and clay pantile take longer to work than concrete interlocking tile, and flat roofs need ballasted or bonded frames.
  • Panel count and panel wattage, which together set the kilowatt peak figure the quote is priced from.
  • Whether optimisers or micro inverters are needed to deal with shading.
  • Distance from the array to the consumer unit, which sets the AC cable run and sometimes a board upgrade.
  • Whether a battery, a diverter to the immersion heater or an EV charger is being fitted on the same visit.

Who quotes for it

3 of the 133 electricians listed on this site take on solar panels.

Most of them in one place: Birmingham (1), Glasgow (1), Rotherham (1).

Questions about solar panels

What is the Smart Export Guarantee worth?

Tariffs vary by supplier and range from a few pence to over 15p a unit, and some of the best rates are tied to buying your import from the same supplier. Eligibility requires an MCS certificate and an export meter, which a smart meter already provides.

Should I add a battery now or later?

Later is cheaper to decide and more expensive to fit, because a retrofit means a second visit and often a second inverter. Adding one at the same time as the array shares the scaffolding, the labour and the DNO application.